A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

NTPC Green Commissions 158.4 MW Andhra Solar Project
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
February 23,2026

NTPC Green Commissions 158.4 MW Solar Project in Andhra Pradesh

NTPC Green Energy Ltd has commissioned 158.4 MW of solar capacity in Andhra Pradesh, part of a 250 MW project operational from February 14, 2026. With this addition, the group’s total installed capacity reached 9,151.08 MW, while commercial capacity rose to 8,992.68 MW. The project is developed by Ayana Kadapa Renewable Power, under ONGC NTPC Green, a joint venture supporting renewable expansion.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related