West Bengal Electricity Regulatory Commission has approved ₹20.14 billion (∼$210.48 million) for WBPDCL's 200 MW floating solar project integrated with 80 MW/320 MWh battery storage at Bakreswar Thermal Power Station reservoir. The hybrid project maximizes land-use efficiency, mitigates solar intermittency and strengthens grid stability, offering blueprint for hybridizing thermal plant water bodies.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.