A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

APTEL Dismisses IREDA’s Review Plea on Kerala Project
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
November 11,2025

APTEL Dismisses IREDA’s Review Plea on Kerala's Solar Project

The Appellate Tribunal for Electricity (APTEL) dismissed IREDA’s review petition concerning a 50 MW solar project in Kasaragod, Kerala. APTEL found no error in its 2022 tariff order of ₹3.83/kWh, rejecting IREDA’s claim that counsel misrepresented ₹25.38 crore infrastructure costs. The tribunal held that IREDA already possessed relevant documents before judgment and failed to exercise due diligence.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related