A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

Premier Energies Shifts 4 GW Solar Facility To Andhra
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
March 07,2025

Premier Energies Shifts 4 GW Solar Cell Manufacturing Facility to Andhra Pradesh

Premier Energies, a Hyderabad-based firm, is relocating its 4 GW Solar PV TOPCon cell manufacturing plant from Telangana to Andhra Pradesh’s Naidupeta Industrial Park. The shift aligns with a backward integration strategy, co-locating Solar Cell Production with a 5 GW silicon ingot and wafer facility.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related