• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
February 09,2026

NTPC REL Issues EPC Tender for 250 MW/1000 MWh BESS at Bikaner Solar Plant

NTPC Renewable Energy Limited has issued an EPC tender to develop a 250 MW/1,000 MWh Battery Energy Storage System at its Bikaner Solar Plant in Rajasthan. The project will provide single-cycle energy with a four-hour discharge and a 25-year design life. Bids are invited from February 12 to 23, 2026, with requirements on dispatchable capacity guarantees, long-term O&M, and prior grid-scale BESS experience to support large-scale solar integration and grid reliability in the region of Rajasthan.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related