NTPC Green Energy Limited (NGEL) has invited bids for the EPC development of a 7,800 MWh Battery Energy Storage System (BESS) at the NTPC REL Bikaner Solar Plant, Rajasthan. The project comprises five blocks totaling 1,950 MW/7,800 MWh and will be executed on a turnkey basis, including design, supply, installation, commissioning, and 15-year O&M.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.