JSW Neo Energy Limited has secured a 400 MW Wind-Solar Hybrid Power Project from MSEDCL, bringing its total Phase-III capacity to 600 MW. The company's total locked-in Generation Capacity has risen to 17.6 GW, with a Hybrid Capacity of 3.2 GW. It aims to achieve 10 GW Installed Capacity by FY25, up from 7.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.