• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
July 01,2025

Hindustan Power Wins 100 MW Solar and 200 MWh BESS Project from SJVNL

Hindustan Power, led by Ratul Puri, secured a 100 MW ISTS-connected solar power project with a 200 MWh Battery Energy Storage System (BESS) from SJVN Limited. The project, part of a larger 1200 MW solar initiative with energy storage, aims to deliver reliable, clean power by balancing solar generation with demand.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related