A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

Fluence Selected for 300 MW Wellington Battery Project
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
July 08,2025

Fluence Energy Selected for 300 MW / 600 MWh Wellington Battery Project in Australia

Fluence Energy has been selected by AMPYR Australia to build the 300 MW / 600 MWh Wellington Stage 1 Battery Energy Storage System (BESS) in New South Wales. The project, scheduled for energization in 2026, includes a 20-year service contract and will use Fluence’s Gridstack™ technology alongside Mosaic bidding and Nispera asset management software.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related