• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
April 29,2025

Edify Energy submits 180 MWh solar plus storage to South Wales EPBC Act

Australia’s renewable energy developer Edify Energy submits solar plus storage site with duration of 2 hours to South Wales EPBC Act. The proposed Bewrongle solar Farm has capacity of 90MWac along with co-located grid scale BESS of 90MW/180MWh. It would connect to the grid via a 132KV transmission line from Wallerawang to Panorama & owned by the transgrid.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related