• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
March 31,2025

Commissioning of 150MW/300MWh Energy Storage Project by Sineng Electrics enhances grid stability

Sineng Electric has deployed its high-power central PCS in a 150MW/300MWh energy storage project in Huaian, China. The project utilizes battery energy storage system (BESS) containers featuring six clusters connected to a single PCS. Unlike the conventional 12-cluster configuration, this design reduces the number of parallel clusters on the DC side by half, significantly lowering the risk of circulating current.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related