• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
November 20,2026

CEA: SOP for Repowering of Wind Power Projects with Mixed WTGs under the CEA Connectivity Regulations

CEA has issued an SOP for repowering wind projects with mixed old and new turbines, setting grid connectivity rules. It allows developers to replace old turbines while operating both types at the same site, under MNRE's 2023 policy. Eligible turbines include those below 2 MW, past design life, non-compliant with quality orders, or repowered after 15 years.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related