CEA has issued an SOP for repowering wind projects with mixed old and new turbines, setting grid connectivity rules. It allows developers to replace old turbines while operating both types at the same site, under MNRE's 2023 policy. Eligible turbines include those below 2 MW, past design life, non-compliant with quality orders, or repowered after 15 years.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.