• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
October 19,2026

NTPC REL Issues EPC Tende for 600MW ISTS-Connected Solar PV Project with Land at Dhule, Maharashtra

NTPC REL issued IFB No. NRE-CS-5848-004(EPC)-9 dated 16.10.2026 for EPC package with land for up to 600MW [300MW+300MW] ISTS connected solar PV near Dhule, Maharashtra under single stage two envelope bidding. Scope includes identification, acquisition and transfer of encumbrance-free land including BESS land, 220kV terminal bay at Dhule PSS, 220kV line with ROW, EPC including ALMM modules, evacuation, telemetry, grid compliance, PG test, spares and 3-year O&M.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related