NTPC Renewable Energy Limited (NTPC REL) has invited bids for the EPC development of a 550 MW/2200 MWh ISTS-connected Battery Energy Storage System (BESS) at its Shimboo Ka Burj Solar Plant in Rajasthan. The project includes design, supply, installation, commissioning, and integration with an existing 550 MW solar plant.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.