A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

Juniper Green Energy commissions 103 MW Solar Project
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
July 22,2025

Juniper Green Energy commissions 103 MW Solar Project in Maharashtra

Juniper Green Energy commissioned the 103 MWp Solar part of its 129 MWp hybrid project in Maharashtra 16 months early. Located in Wardha district, the project supplies power to MSEDCL via Juniper Green Power Five Private Limited. The solar capacity was commissioned in two phases in June and July 2025, ahead of the original November 2026 schedule.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related