A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

Enviro Infra Acquires 49% Stake in Bihar BESS Project
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
April 23,2026

Enviro Infra Acquires 49% Stake in Bihar BESS Project

Enviro Infra Engineers, through its subsidiary EIE Renewables, acquired a 49% stake in PRA Bihar BESS for ₹15.51 crore, with plans to acquire the remaining 51% post-COD. The SPV is developing a 37.5 MW/150 MWh battery energy storage project in Bihar under BOOT mode with Viability Gap Funding support.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related