JSW Neo Energy Wins 400 MW Wind-Solar Power Project from MSEDCL
JSW Neo Energy Limited has secured a 400 MW Wind-Solar Hybrid Power Project from MSEDCL, bringing its total Phase-III capacity to 600 MW. The company's total locked-in Generation Capacity has risen to 17.6 GW, with a Hybrid Capacity of 3.2 GW. It aims to achieve 10 GW Installed Capacity by FY25, up from 7.5 GW.
Also Read Business Upturn