A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

GE Vernova, Drydocks awarded 2 GW grid connection
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
December 17,2024

GE Vernova, Drydocks awarded 2 GW grid connection for Offshore Wind Project

50 Hertz has awarded GE Vernova and Drydocks World the Engineering, procurement, Construction and Installation (EPCI) contract to deliver 2 GW Ostwind 4 grid connection in the German Baltic Sea. GE Vernova and Drydocks will build the direct current (DC) converter system which will comprise a converter at sea and a converter on land for Ostwind 4 grid connection.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related