A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/energyinfra.market/einfews.energyinfra.market/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/energyinfra.market/einfews.energyinfra.market/index.php
Line: 272
Function: require_once

Enrich wins 290 MWh BESS Project at Simhadri TPS in AP
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
April 27,2026

Enrich wins 290 MWh BESS Project at Simhadri TPS in Andhra Pradesh

Enrich has secured a contract with NTPC Ltd to deploy a 290 MWh Battery Energy Storage System at the Simhadri Thermal Power Station in Andhra Pradesh. Enrich will handle end-to-end EPC, including installation, integration, monitoring, and O&M. The scope covers BMS, EMS, SCADA, PCS, and transformers.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related